Can you price from a site sketch?
A marked-up sketch can help start a discussion. Dimensions, elevations, duty, loading, tie-in points, support conditions, access routes and site constraints are needed to establish a reliable work package.
Temporary access scope for industrial work fronts
Industrial access planning starts with the task, the equipment to be reached and the limits of the live site. A suitable temporary access scope depends on dimensions, loading, ground or support conditions, nearby operations, exclusion zones, weather exposure and the site’s scaffold rules. ARS EXIM accepts enquiries for scaffolding and access requirements; the specific system, design responsibility, inspection regime and equipment availability must be agreed for each project.
The steps below are a discussion framework. The actual sequence, responsibilities, technical submittals and handover requirements must be agreed with the client and relevant site representatives for each project.
Identify the requested discipline, asset, project type, country, schedule and the information already available.
Compare drawings, bills of quantities, specifications and site rules. List missing information and questions that affect scope.
Agree the work limits, interfaces, access assumptions, quantities, responsibilities and exclusions before commercial pricing.
Discuss permits, work fronts, operating constraints, materials approvals and the sequence required by the project team.
Confirm project-specific inspection points, records, acceptance criteria and handover documents in the enquiry or contract documents.
Materials, manufacturer systems, standards, design values, certifications, inspection criteria and acceptance records are not assumed on this page. Submit the client specification or tender documents so the applicable requirements can be identified before a proposal is prepared.
A marked-up sketch can help start a discussion. Dimensions, elevations, duty, loading, tie-in points, support conditions, access routes and site constraints are needed to establish a reliable work package.
The project documents and local site requirements should identify design responsibility, competent-person requirements, inspection frequency, tagging and handover records. These should be agreed before mobilisation.
The enquiry can include multiple disciplines and shared work fronts. List each activity, sequence, access window and contractor interface so responsibilities and assumptions can be reviewed together.
Share the site location, work type, timeline, available drawings and project specification. Attachments can be added through the quote form.